当前学科:船舶动力装置
  • 题目: 单选
    In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()

      A . The safety valve escape piping should be disconnected from the valve body and a blank inserted
      B . The boiler vent valves should be opened
      C . All handhole/manhole covers should be tightened up as much as possible to preclude any leaks
      D . All of the above

    答案: <查看本题扣1积分>

    查看答案

    答案不对?请尝试站内搜索