主页
学科
搜索
账户
常见问题
当前学科:选矿脱水工(中级)
题目:
判断题
患有高血压、心脏病、手脚残疾、深度近视者,不得从事高空作业。
A . 正确
B . 错误
答案:
<查看本题扣1积分>
查看答案
答案不对?请尝试站内搜索
推荐知识点:
“活褶”可直接捶击最凸脊处。
联体双胎()
简述语法具有哪些特征。
集邮营业员对预订户预订的票品应按时()供应。
德国古典哲学始自()
Estimating schedule activity costs involves developing an (1) of the cost of theresources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additionalwork during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of (2) to facilitate comparisons both within and across projects.the (3) describes important information about project requirement that is considered during cost estimating. 空白(2)处填()
十二指肠溃疡的特点,不正确的是()
推力瓦刮削进行到最后应当按照图纸要求,刮好()。
导游人员发现夏令营学生错误应及时批评,避免发生更严重的问题。()
患者女,25岁,7月自缅甸旅游回来后出现 发热,诊断为疟疾,给予氯喹及伯氨奎治疗后体 温无下降,高达40 ℃以上;血涂片仍然见红细 胞内较多的疟原虫环状体。应选择的治疗药物是()