A . Any leaks in piping, propeller shaft, machinery, tanks, will have to be repaired on the spot
B . Any leaks in piping, propeller shaft, machinery, tanks, will have to be repaired on the next port of call
C . Any leaks in piping, propeller shaft, machinery, tanks, will have to be repaired until the next stop
D . Any leaks in piping, propeller shaft, machinery, tanks, will have to be at least patched u
答案不对?请尝试站内搜索