主页
学科
搜索
账户
常见问题
当前学科:经济学
题目:
名词解析
休闲渔业
答案:
<查看本题扣1积分>
查看答案
答案不对?请尝试站内搜索
推荐知识点:
Estimating schedule activity costs involves developing an (1) of the cost of theresources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additionalwork during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of (2) to facilitate comparisons both within and across projects.the (3) describes important information about project requirement that is considered during cost estimating. 空白(2)处填()
在日本,资格证书的授予者为都道府县教育委员会或知事。()
7S理论中属于软管理要素的是()
阻碍人际关系的主要因素有:()
食管癌手术应用最为广泛的方式是()。
根据《注册监理工程师管理规定》,注册监理工程师的权利有()
面部浅Ⅱ度烧伤,面积1%。创面最佳的处理方法是()
《环境保护法》规定,企业事业单位和其他生产经营者违法排放污染物,受到罚款处罚,被责令改正,拒不改正的,依法作出处罚决定的行政机关可以自责令改正之日的次日起,()
()取水构筑物的主要区别在于是否需要进水管引水至岸边。
均匀控制系统参数的变化的特点是()