      A requirement for an "inspection certificate" does not constitute a requirement to evidence a pre-shipment event (e.g.pre-shipment inspection certificate) so that inspection certificate may be dated after the date of shipment, but must not indicate the date after the latest date for presentation of documents.

        If a B/L on board dated 10 June, 200× while the inspection certificate dated 11 June, 200×, it is( ) acceptable/( ) unacceptable.