主页
学科
搜索
账户
常见问题
当前学科:口腔修复相关专业知识
题目:
单选
易致远中错
的功能异常是()
答案:
<查看本题扣1积分>
查看答案
答案不对?请尝试站内搜索
推荐知识点:
Estimating schedule activity costs involves developing an (1) of the cost of theresources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additionalwork during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of (2) to facilitate comparisons both within and across projects.the (3) describes important information about project requirement that is considered during cost estimating. 空白(1)处填() 空白(2)处填() 空白(3)处填()
下列哪一项有助于有效沟通的建立()。
心肌梗死的并发症不包括()
干粉灭火器可有效地扑救()的火灾。
水冷却器沉积物由()组成。
制定绿色营销计划时需要考虑的外在因素有()
因错误办理行车凭证,致使旅客列车在站停车时间超过图定的停车时间,后又正确办理行车凭证发车为()
被病毒污染的场地,首选下列哪种消毒药进行消毒?()
清热凉血法包括的两法为()
简述融资期限和偿还资金方式